Altuwaim, A and El-Rayes, K (2018) Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost. Journal of Construction Engineering and Management, 144(07).

Hasanzadeh, S, Esmaeili, B and Dodd, M D (2018) Examining the Relationship between Construction Workers’ Visual Attention and Situation Awareness under Fall and Tripping Hazard Conditions: Using Mobile Eye Tracking. Journal of Construction Engineering and Management, 144(07).

Hosseini, M R, Martek, I, Chileshe, N, Zavadskas, E K and Arashpour, M (2018) Assessing the Influence of Virtuality on the Effectiveness of Engineering Project Networks: “Big Five Theory” Perspective. Journal of Construction Engineering and Management, 144(07).

Hwang, S, Jebelli, H, Choi, B, Choi, M and Lee, S (2018) Measuring Workers’ Emotional State during Construction Tasks Using Wearable EEG. Journal of Construction Engineering and Management, 144(07).

Jordan Srour, F, Kiomjian, D and Srour, I M (2018) Automating the Use of Learning Curve Models in Construction Task Duration Estimates. Journal of Construction Engineering and Management, 144(07).

Karakhan, A A, Rajendran, S, Gambatese, J and Nnaji, C (2018) Measuring and Evaluating Safety Maturity of Construction Contractors: Multicriteria Decision-Making Approach. Journal of Construction Engineering and Management, 144(07).

  • Type: Journal Article
  • Keywords: Safety maturity; Decision making; Choosing by advantages (CBA); Construction safety; Leading indicators; Lagging indicators; Contractor selection; Technology; Innovation; Safety culture;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001503
  • Abstract:
    Evaluating the safety maturity of construction contractors before awarding the contract is an effective strategy that many owners have started to implement. Given the importance of workplace safety, awarding the contract to safer contractors can enhance project performance outcomes in terms of safety, quality, cost, and schedule. Safety maturity is one quality of a construction organization encompassing interdependent factors that can be used to evaluate expected safety performance. However, there is no formal decision-making framework available in literature that owners can use to evaluate contractor safety maturity. The present study aims to bridge this gap in safety knowledge by proposing a decision-making framework that can be used to evaluate the safety maturity of construction contractors. Development of the decision-making framework included two tasks. First, an integrative literature review to identify influential safety maturity factors and their potential indicators was performed. The result of the review revealed seven factors (safety leading indicators, safety lagging indicators, safety and supervisory personnel, system maturity and resiliency, preconstruction services, technology and innovation, and safety culture) that influence the safety maturity of construction contractors. Second, the identified factors, and their indicators, were integrated into a formal multicriteria decision-making method, referred to as Choosing by Advantages, to evaluate the safety maturity of five construction contractors on a selected case study project. The proposed framework is expected to provide practical and theoretical directions on how to evaluate contractor safety maturity using relevant evaluation factors and sound decision-making methods.

Karimi, H, Taylor, T R B, Dadi, G B, Goodrum, P M and Srinivasan, C (2018) Impact of Skilled Labor Availability on Construction Project Cost Performance. Journal of Construction Engineering and Management, 144(07).

Konstantinou, E and Brilakis, I (2018) Matching Construction Workers across Views for Automated 3D Vision Tracking On-Site. Journal of Construction Engineering and Management, 144(07).

Lee, C Y, Chong, H and Wang, X (2018) Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. Journal of Construction Engineering and Management, 144(07).

Liu, J and Lu, M (2018) Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints. Journal of Construction Engineering and Management, 144(07).

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid Genetic Algorithm and Linear Programming for Bulldozer Emissions and Fuel-Consumption Management Using Continuously Variable Transmission. Journal of Construction Engineering and Management, 144(07).

Mirzaei, A, Nasirzadeh, F, Parchami Jalal, M and Zamani, Y (2018) 4D-BIM Dynamic Time–Space Conflict Detection and Quantification System for Building Construction Projects. Journal of Construction Engineering and Management, 144(07).

Sankaran, B and O’Brien, W J (2018) Impact of CIM Technologies and Agency Policies on Performance for Highway Infrastructure Projects. Journal of Construction Engineering and Management, 144(07).

Swei, O (2018) Long-Run Construction Cost Trends: Baumol’s Cost Disease and a Disaggregate Look at Building Material Price Dynamics. Journal of Construction Engineering and Management, 144(07).

Trinh, M T, Feng, Y and Jin, X (2018) Conceptual Model for Developing Resilient Safety Culture in the Construction Environment. Journal of Construction Engineering and Management, 144(07).